CSEP Minutes 08-07-2019: Difference between revisions
From SCECpedia
Jump to navigationJump to search
Created page with "'''CSEP Working Group Home Page<br>''' ''Participants:'' W. Savran" |
No edit summary |
||
| Line 1: | Line 1: | ||
'''[[CSEP_Working_Group|CSEP Working Group Home Page]]<br>''' | '''[[CSEP_Working_Group|CSEP Working Group Home Page]]<br>''' | ||
''Participants:'' W. Savran | ''Participants:'' W. Savran, A. Michael, M. Werner, D. Rhoades | ||
* finite fault uncertainty 3.0% error in source model has equivalent error to 1 Mw unit when thinking about slip. | |||
* time-dependent magnitude of completeness during first 2 days of the sequence. page 2016 and hardebeck, originally from anges helmstetter. | |||
* place dots at the end of the bin and bin daily, hourly for days, log-scale (y-axis) or log-log with logarithmically spaced bins. | |||
* 1 WC radius around centroid of the sequence this can come from Comcat. | |||
* consider using jet for the conditional rate density plots. | |||
* crd: increase the magnitude greater that mw 4.0. | |||
* m-test: magnitude of completeness plots, compute conditional on the number of events. | |||
* s-test: compute conditional on the number of events like the m-test, spatial map of the likelihood scores. | |||
* for stat_sei: need plots to illustrate what we are doing visually. | |||
* b-value: should look conditionally on event numbers. | |||
* inter event distance change from 2d to 3d. | |||
* srl special issue with ucerf3 forecasts. are simulation results considered data. | |||
Revision as of 20:08, 7 August 2019
Participants: W. Savran, A. Michael, M. Werner, D. Rhoades
- finite fault uncertainty 3.0% error in source model has equivalent error to 1 Mw unit when thinking about slip.
- time-dependent magnitude of completeness during first 2 days of the sequence. page 2016 and hardebeck, originally from anges helmstetter.
- place dots at the end of the bin and bin daily, hourly for days, log-scale (y-axis) or log-log with logarithmically spaced bins.
- 1 WC radius around centroid of the sequence this can come from Comcat.
- consider using jet for the conditional rate density plots.
- crd: increase the magnitude greater that mw 4.0.
- m-test: magnitude of completeness plots, compute conditional on the number of events.
- s-test: compute conditional on the number of events like the m-test, spatial map of the likelihood scores.
- for stat_sei: need plots to illustrate what we are doing visually.
- b-value: should look conditionally on event numbers.
- inter event distance change from 2d to 3d.
- srl special issue with ucerf3 forecasts. are simulation results considered data.