Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== | == Yesterday == | ||
*Narrowed down RWG 3D issue to input files; ran SMALL site to help with debugging | |||
*Got in trouble on Ranger | |||
*Got rupture geometries from Kevin for F2F ruptures | |||
*Checked | |||
== Today == | |||
*Try Pegasus 4.0.0 with TEST curve | |||
*Run TEST curve with in-mem RV generation on Ranger | |||
*Run post-processing for full CS site with Kraken SGTs | |||
*Email Rob F2F ruptures, ask for thoughts | |||
== Blocked == | |||
*No | |||
== Follow-ups == | |||
*No | |||
== Areas of Responsibilities == | == Areas of Responsibilities == | ||
Revision as of 18:03, 21 February 2012
Yesterday
- Narrowed down RWG 3D issue to input files; ran SMALL site to help with debugging
- Got in trouble on Ranger
- Got rupture geometries from Kevin for F2F ruptures
- Checked
Today
- Try Pegasus 4.0.0 with TEST curve
- Run TEST curve with in-mem RV generation on Ranger
- Run post-processing for full CS site with Kraken SGTs
- Email Rob F2F ruptures, ask for thoughts
Blocked
- No
Follow-ups
- No
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration