Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
Fsilva (talk | contribs)
No edit summary
Line 2: Line 2:


* Fling Study
* Fling Study
** Verified Scenario 138
** We are now 35/42
** We are now 35/42
** Filesystem issue on intensity (not due to Fling Study data, but because of a disk failure - /home/scec-01 was down)
** Scenario 117 finished, waiting for John to move the data
** Moved all our data from scec-01 to broadband-00 -- it is all in one place now
** Finished creating tar files for Ronnie to download
** Created most tar files for Ronnie to download
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
* Created/updated few Trac issues
* Agile discussion
* Looked up Agile development practices
* GMSV science call
* Moved plot data from Greens Functions directory to the main BBP distribution
* Investigated issue where the station_map is not generated


== Today: ==
== Today: ==


* Fling Study
* Fling Study
** Cannot start scenario 139 due to Friday downtime on intensity
** Validate scenario 117
** Ping John Yu to find out about remaining scenarios
** Ping John Yu to find out about remaining scenarios
** Finish creating tar files for Ronnie
** Validate any scenarios John has finished
** Validate any scenarios John has finished
* Meet with Phil to discuss Christine's e-mail and dataset
* Have simple fix to make trunk work both with and without site response
* Agile development discussion
* Meet with Phil to discuss Broadband development
* GNSV call with science team
* Figure out how to separate the validation data from Greens Functions


== Blocked: ==
== Blocked: ==
Line 26: Line 25:


== Followups: ==
== Followups: ==
* Agile discussion at 1pm
* Phil to discuss Broadband development @ after standup call
* GNSV call at 2pm
* Phil to discuss Christine's e-mail and dataset @ TBD


== Ongoing: ==  
== Ongoing: ==  
* Make trunk work both with and without site response
* Look for ways to break up the GF directory layout, some ideas are:
* Look for ways to break up the GF directory layout, some ideas are:
** First candidate is removing the plot directory from the GF directory
** Create separate validation package
** Create separate validation package
** Separate events and codebases from each other
** Separate events and codebases from each other

Revision as of 16:56, 15 June 2012

Yesterday:

  • Fling Study
  • Agile discussion
  • GMSV science call
  • Moved plot data from Greens Functions directory to the main BBP distribution
  • Investigated issue where the station_map is not generated

Today:

  • Fling Study
    • Validate scenario 117
    • Ping John Yu to find out about remaining scenarios
    • Validate any scenarios John has finished
  • Have simple fix to make trunk work both with and without site response
  • Meet with Phil to discuss Broadband development
  • Figure out how to separate the validation data from Greens Functions

Blocked:

  • Cannot run more Fling scenarios till intensity's disks are restored

Followups:

  • Phil to discuss Broadband development @ after standup call

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Create separate validation package
    • Separate events and codebases from each other