Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 2: | Line 2: | ||
* Fling Study | * Fling Study | ||
** Scenario | ** Scenario 139 validated | ||
** We are now | ** We are now 38/42 | ||
** Remaining scenarios running on GEOSYS | ** Remaining scenarios all running on GEOSYS | ||
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS | ||
* Talked to John Yu about | * Talked to John Yu about Broadband resources, backups | ||
* Worked on testing code on trunk, | * Worked on testing code on trunk, fixed few issues | ||
* Trunk passes Unit tests | |||
* Finishing running Acceptance tests (so far so good...) | |||
== Today: == | == Today: == | ||
| Line 13: | Line 15: | ||
* Fling Study | * Fling Study | ||
** Monitoring running scenarios | ** Monitoring running scenarios | ||
* Make trunk pass Acceptance tests | * Make trunk pass Acceptance tests | ||
* | * Continue working on the testing framework | ||
* Start full validation comparison of trunk versus 11.2.3 | |||
* Work on Cruise Control setup (pending John Yu install) | |||
== Blocked: == | == Blocked: == | ||
| Line 21: | Line 24: | ||
== Followups: == | == Followups: == | ||
* | * Cybershake call @ 11 | ||
== Ongoing: == | == Ongoing: == | ||
Revision as of 15:55, 20 June 2012
Yesterday:
- Fling Study
- Scenario 139 validated
- We are now 38/42
- Remaining scenarios all running on GEOSYS
- Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
- Talked to John Yu about Broadband resources, backups
- Worked on testing code on trunk, fixed few issues
- Trunk passes Unit tests
- Finishing running Acceptance tests (so far so good...)
Today:
- Fling Study
- Monitoring running scenarios
- Make trunk pass Acceptance tests
- Continue working on the testing framework
- Start full validation comparison of trunk versus 11.2.3
- Work on Cruise Control setup (pending John Yu install)
Blocked:
- No
Followups:
- Cybershake call @ 11
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- Figure out how to separate the validation data from Greens Functions
- Create separate validation package
- Separate events and codebases from each other