Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 3: Line 3:
* Fling Study
* Fling Study
** We are now 40/42
** We are now 40/42
** GEOSYS had a power outage yesterday -- running scenarios terminated
** Running 118 and 124 on HPCC, using trunk and updated parallel scripts
** Running 118 and 124 on HPCC, using trunk and updated parallel scripts
** Scenario 124 is: 78/178 stations, Scenario 118 is 76/241 stations.
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
** Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
* Trunk fails UCSB Loma Prieta full validation
* Ran full validation of UCSB Loma Prieta on both trunk and 11.2.3
** This issue is documented in Trac issue #77
** Extra station in trunk causes (non fatal) error messages, as documented in Trac issue #77
** Running UCSB LP full validation with 11.2.3 to confirm results match
* John Yu installed Cruise Control
* John Yu installed Cruise Control
* Met with Phil to talk about Broadband development
* Broadband science call
** Discussed recent progress and goals
* Met with Phil to talk about Broadband development for next 2 weeks


== Today: ==
== Today: ==
Line 17: Line 16:
* Fling Study
* Fling Study
** Monitoring running scenarios
** Monitoring running scenarios
* Package new parallel running scripts and check them into svn as part of BBP
* Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
* Fix Trac issue #77 (UCSB LP validation)
* Fix Trac issue #77 (UCSB LP validation)
* Start sketching BBP workflow (component by component with input and output files)
* Continue sketching BBP workflow (component by component with input and output files)
* Plan separation of GF, validation data, and velocity models
* Trac issue #82: Start separation of GF and validation data
* Work on Cruise Control setup
* Trac issue #128: Start work on Cruise Control setup
* BBP Science call


== Blocked: ==
== Blocked: ==
Line 28: Line 26:


== Followups: ==
== Followups: ==
* Broadband tasks for next two weeks with Phil @ TBD
* No
* Broadband Science call @ 2pm


== Ongoing: ==  
== Ongoing: ==  
Line 35: Line 32:
** Figure out how to separate the validation data from Greens Functions
** Figure out how to separate the validation data from Greens Functions
** Create separate validation package
** Create separate validation package
** Separate events and codebases from each other
** Separate events from each other

Revision as of 16:21, 2 July 2012

Yesterday:

  • Fling Study
  • Ran full validation of UCSB Loma Prieta on both trunk and 11.2.3
    • Extra station in trunk causes (non fatal) error messages, as documented in Trac issue #77
  • John Yu installed Cruise Control
  • Broadband science call
  • Met with Phil to talk about Broadband development for next 2 weeks

Today:

  • Fling Study
    • Monitoring running scenarios
  • Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
  • Fix Trac issue #77 (UCSB LP validation)
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac issue #82: Start separation of GF and validation data
  • Trac issue #128: Start work on Cruise Control setup

Blocked:

  • No

Followups:

  • No

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events from each other