Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Investigated and fixed the rupture plot issue (Trac #152) | ||
* Checked | ** Problem was caused by rounding issues | ||
* | ** Acceptance tests run ok now | ||
* | * Checked bias plots for all full validations | ||
* | ** All ok on the broadband server, next step is to test on HPCC | ||
* | * Broadband development planning meeting with Phil | ||
* Continue sketching BBP workflow (match module) | |||
* Started working on SCEC meeting abstract | |||
== Today: == | == Today: == | ||
* | * Finish SCEC meeting abstract | ||
* Continue sketching BBP workflow (component by component with input and output files) | * Continue sketching BBP workflow (component by component with input and output files) | ||
* | * Meeting with Kim and Rumi | ||
* HPCC scripts | |||
** Full validations | |||
** 50-realization LOMAP script | |||
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac #131: Package new parallel running scripts and check them into svn as part of BBP | ||
* Integrate SDSU code v1.4 into Broadband (after call | * Integrate SDSU code v1.4 into Broadband (after call today) | ||
* Trac #128: Work on Cruise Control setup | * Trac #128: Work on Cruise Control setup | ||
| Line 23: | Line 26: | ||
== Followups: == | == Followups: == | ||
* | * BBToolbox call with Kim and Rumi @ 2pm | ||
Revision as of 17:03, 9 August 2012
Yesterday:
- Investigated and fixed the rupture plot issue (Trac #152)
- Problem was caused by rounding issues
- Acceptance tests run ok now
- Checked bias plots for all full validations
- All ok on the broadband server, next step is to test on HPCC
- Broadband development planning meeting with Phil
- Continue sketching BBP workflow (match module)
- Started working on SCEC meeting abstract
Today:
- Finish SCEC meeting abstract
- Continue sketching BBP workflow (component by component with input and output files)
- Meeting with Kim and Rumi
- HPCC scripts
- Full validations
- 50-realization LOMAP script
- Trac #131: Package new parallel running scripts and check them into svn as part of BBP
- Integrate SDSU code v1.4 into Broadband (after call today)
- Trac #128: Work on Cruise Control setup
Blocked:
- No
Followups:
- BBToolbox call with Kim and Rumi @ 2pm