Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Investigated and fixed the rupture plot issue (Trac #152)
* Finished SCEC abstract, got comments from Phil
** Problem was caused by rounding issues
* Finished sketching BBP GP pipeline
** Acceptance tests run ok now
* Met with Kim and Rumi
* Checked bias plots for all full validations
** Bring new version of BBToolbox into the Platform
** All ok on the broadband server, next step is to test on HPCC
** Waiting for Rumi to send input and output files for new code
* Broadband development planning meeting with Phil
* Continue sketching BBP workflow (match module)
* Started working on SCEC meeting abstract


== Today: ==
== Today: ==


* Finish SCEC meeting abstract
* Submit SCEC meeting abstract
* Continue sketching BBP workflow (component by component with input and output files)
* Continue sketching BBP workflow (UCSB and SDSU pipelines)
* Meeting with Kim and Rumi
* HPCC scripts
* HPCC scripts
** Full validations
** Full validations
** 50-realization LOMAP script
** 50-realization LOMAP script
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Integrate SDSU code v1.4 into Broadband (after call today)
* Integrate SDSU code v1.4 into Broadband (after receiving data files)
* Trac #128: Work on Cruise Control setup
* Trac #128: Work on Cruise Control setup


Line 26: Line 22:


== Followups: ==
== Followups: ==
* BBToolbox call with Kim and Rumi @ 2pm
* BBP development plan with Phil @ TBD
* Christine @ TBD
* BBP Science call @ 2pm

Revision as of 17:03, 10 August 2012

Yesterday:

  • Finished SCEC abstract, got comments from Phil
  • Finished sketching BBP GP pipeline
  • Met with Kim and Rumi
    • Bring new version of BBToolbox into the Platform
    • Waiting for Rumi to send input and output files for new code

Today:

  • Submit SCEC meeting abstract
  • Continue sketching BBP workflow (UCSB and SDSU pipelines)
  • HPCC scripts
    • Full validations
    • 50-realization LOMAP script
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
  • Integrate SDSU code v1.4 into Broadband (after receiving data files)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No

Followups:

  • BBP development plan with Phil @ TBD
  • Christine @ TBD
  • BBP Science call @ 2pm