Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Finished SCEC abstract, got comments from Phil
* Received feedback on SCEC abstract, submitted it
* Wrote module to handle sub-pipeline for observed seismograms
** Handles bbp acceleration and peer formatted files
* Finished sketching BBP GP pipeline
* Finished sketching BBP GP pipeline
* Met with Kim and Rumi
* Broadband science call
** Bring new version of BBToolbox into the Platform
* Broadband devel meeting with Phil
** Waiting for Rumi to send input and output files for new code


== Today: ==
== Today: ==


* Submit SCEC meeting abstract
* Finish work on observed seismograms BBP module
* Continue sketching BBP workflow (UCSB and SDSU pipelines)
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
** Test new package with trunk
* HPCC scripts
* HPCC scripts
** Full validations
** Full validations
** 50-realization LOMAP script
** 50-realization LOMAP script
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
* Continue sketching BBP workflow (UCSB and SDSU pipelines)
* Integrate SDSU code v1.4 into Broadband (after receiving data files)
* Integrate SDSU code v1.4 into Broadband (after receiving data files)
* Trac #128: Work on Cruise Control setup
* Trac #128: Work on Cruise Control setup


== Blocked: ==
== Blocked: ==
* No
* No (but Broadband.usc.edu is down)


== Followups: ==
== Followups: ==
* BBP development plan with Phil @ TBD
* No
* Christine @ TBD
* BBP Science call @ 2pm

Revision as of 17:04, 13 August 2012

Yesterday:

  • Received feedback on SCEC abstract, submitted it
  • Wrote module to handle sub-pipeline for observed seismograms
    • Handles bbp acceleration and peer formatted files
  • Finished sketching BBP GP pipeline
  • Broadband science call
  • Broadband devel meeting with Phil

Today:

  • Finish work on observed seismograms BBP module
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
    • Test new package with trunk
  • HPCC scripts
    • Full validations
    • 50-realization LOMAP script
  • Continue sketching BBP workflow (UCSB and SDSU pipelines)
  • Integrate SDSU code v1.4 into Broadband (after receiving data files)
  • Trac #128: Work on Cruise Control setup

Blocked:

  • No (but Broadband.usc.edu is down)

Followups:

  • No