Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* Sent e-mail to | * Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters | ||
* Talked to JY, and got matplotlib updated on HPCC | |||
* | * GOF unit test passes on HPCC | ||
* | |||
* Set up trunk on HPCC | * Set up trunk on HPCC | ||
** | * Updated batching scripts for using the new trunk | ||
** Ran Fling scenario 101 | |||
== Today: == | == Today: == | ||
* | * Work on generating Arias duration plot | ||
* Check batching scripts into svn (Trac #131) | |||
* | |||
* Write script to run LOMAP full validation on HPCC | * Write script to run LOMAP full validation on HPCC | ||
| Line 21: | Line 18: | ||
== Followups: == | == Followups: == | ||
* | * No | ||
Revision as of 17:37, 29 August 2012
Yesterday:
- Sent e-mail to RA and JC with rupture plots for LOMAP and asking about missing parameters
- Talked to JY, and got matplotlib updated on HPCC
- GOF unit test passes on HPCC
- Set up trunk on HPCC
- Updated batching scripts for using the new trunk
- Ran Fling scenario 101
Today:
- Work on generating Arias duration plot
- Check batching scripts into svn (Trac #131)
- Write script to run LOMAP full validation on HPCC
Blocked:
- No
Followups:
- No