Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Worked on implementing the correct_rotd50 module | ||
* | * Compared fling results from new trunk to what we got in June --> Checks out fine. | ||
* Updated batching scripts for using the new trunk | * Updated batching scripts for using the new trunk | ||
== Today: == | == Today: == | ||
* Finish correct_rotd50 module, write test case | |||
* Work on generating Arias duration plot | * Work on generating Arias duration plot | ||
* Check batching scripts into svn (Trac #131) | * Check batching scripts into svn (Trac #131) | ||
* Follow-up with RG, RA, JC regarding needed parameters for LOMAP | |||
* Write script to run LOMAP full validation on HPCC | * Write script to run LOMAP full validation on HPCC | ||
| Line 18: | Line 17: | ||
== Followups: == | == Followups: == | ||
* | * Broadband meeting with Phil @ TBD | ||
* Broadband science call @ 2pm | |||
Revision as of 17:17, 31 August 2012
Yesterday:
- Worked on implementing the correct_rotd50 module
- Compared fling results from new trunk to what we got in June --> Checks out fine.
- Updated batching scripts for using the new trunk
Today:
- Finish correct_rotd50 module, write test case
- Work on generating Arias duration plot
- Check batching scripts into svn (Trac #131)
- Follow-up with RG, RA, JC regarding needed parameters for LOMAP
- Write script to run LOMAP full validation on HPCC
Blocked:
- No
Followups:
- Broadband meeting with Phil @ TBD
- Broadband science call @ 2pm