Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Worked on implementing the correct_rotd50 module
* Finished correct_rotd50 module, tested ok
* Compared HPCC fling results from new trunk to what we got in June --> Checks out fine.
* Changed workflow generator so that it works with and without the site correction
* Updated batching scripts for using the new trunk
* Ran full validations for LP,LA,NR using UCSB code
** Fixed minor issues
* Checked batch utils into SVN
* Broadband science call
* Broadband meeting with Phil


== Today: ==
== Today: ==


* Finish correct_rotd50 module, write test case
* Create updated validation packages for all events
** Add UCSB LOMAP files for test run
* Start SCEC meeting poster
* Look into new BBToolBox
* Work on generating Arias duration plot
* Work on generating Arias duration plot
* Check batching scripts into svn (Trac #131)
* Follow-up with RG, RA, JC regarding needed parameters for LOMAP
* Write script to run LOMAP full validation on HPCC
* Write script to run LOMAP full validation on HPCC


Line 17: Line 22:


== Followups: ==
== Followups: ==
* Broadband meeting with Phil @ TBD
* No
* Broadband science call @ 2pm

Revision as of 17:07, 4 September 2012

Yesterday:

  • Finished correct_rotd50 module, tested ok
  • Changed workflow generator so that it works with and without the site correction
  • Ran full validations for LP,LA,NR using UCSB code
    • Fixed minor issues
  • Checked batch utils into SVN
  • Broadband science call
  • Broadband meeting with Phil

Today:

  • Create updated validation packages for all events
    • Add UCSB LOMAP files for test run
  • Start SCEC meeting poster
  • Look into new BBToolBox
  • Work on generating Arias duration plot
  • Write script to run LOMAP full validation on HPCC

Blocked:

  • No

Followups:

  • No