Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* SCEC Meeting
* Ran GP and UCSB on Broadband and HPCC
** Very good
** Results posted on wiki
** Good conversations/technical discussions
* Broadband Planning meeting with PG&E and SCE
** Few platform improvement suggestions
* SCEC AM Poster from Ronnie
* Need to re-run a few large scenarios with different parameters


== Today: ==
== Today: ==
Line 17: Line 18:


== Followups: ==
== Followups: ==
* Broadband update with Phil
* No

Revision as of 16:29, 17 September 2012

Yesterday:

  • Ran GP and UCSB on Broadband and HPCC
    • Results posted on wiki
  • Broadband Planning meeting with PG&E and SCE
  • SCEC AM Poster from Ronnie
  • Need to re-run a few large scenarios with different parameters

Today:

  • Finish implementation of Arias Duration
  • Split GP GOF module into 2
    • Bias plot generation
    • Everything else

Blocked:

  • No

Followups:

  • No