Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Tested the new gen_plots and gp_gof modules | ||
* Added arias duration plot to the gen_plots module | |||
* | * Exchanged e-mails with RG about changing the simulation run time | ||
* e- | |||
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios | * e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios | ||
== Today: == | == Today: == | ||
* | * Test Arias Duration implementation, check code into svn | ||
* Try running jbsim with different simulation windows | |||
* | * Call with RK, PM | ||
* | * Work on BBToolbox integration | ||
== Blocked: == | == Blocked: == | ||
| Line 19: | Line 17: | ||
== Followups: == | == Followups: == | ||
* | * Cybershake call @ 11am | ||
* RK, PM call @ 1:30pm | |||
Revision as of 16:51, 19 September 2012
Yesterday:
- Tested the new gen_plots and gp_gof modules
- Added arias duration plot to the gen_plots module
- Exchanged e-mails with RG about changing the simulation run time
- e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
Today:
- Test Arias Duration implementation, check code into svn
- Try running jbsim with different simulation windows
- Call with RK, PM
- Work on BBToolbox integration
Blocked:
- No
Followups:
- Cybershake call @ 11am
- RK, PM call @ 1:30pm