Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* Tested | * Tested Arias Duration implementation | ||
* | * Ran jbsim with different simulation windows | ||
* | ** Two parameters involved: ntout and maxnt | ||
* Compiled Norm's faster RotD50 code | |||
* | * Call with RK, PM | ||
* Ran LOMAP GP code | |||
== Today: == | == Today: == | ||
* Test | * Test new version of RotD50 code | ||
** LOMAP GP and UCSB | |||
* | |||
* | |||
* Work on BBToolbox integration | * Work on BBToolbox integration | ||
* Broadband science call | |||
== Blocked: == | == Blocked: == | ||
| Line 19: | Line 19: | ||
== Followups: == | == Followups: == | ||
* | * Broadband science call @ 1pm | ||
Revision as of 17:04, 20 September 2012
Yesterday:
- Tested Arias Duration implementation
- Ran jbsim with different simulation windows
- Two parameters involved: ntout and maxnt
- Compiled Norm's faster RotD50 code
- Call with RK, PM
- Ran LOMAP GP code
Today:
- Test new version of RotD50 code
- LOMAP GP and UCSB
- Work on BBToolbox integration
- Broadband science call
Blocked:
- No
Followups:
- Broadband science call @ 1pm