Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* SI2 supplemental USC statement of work
* Posted CME files
* ALCF Call noon
* Reviewed SI2 proposal and data management plan
* CyberShake Call 11am
* BBP Call 2pm
* BBP Call 1:30pm
* Follow-up SAM meeting with Nadia and Illa
* install pynga on mac
* Confirm call with Ralph on server diffs for Monday 2pm
* SCEC Annual Meeting (SAM) follow-ups
* Meeting with Tom on SI2 proposal
* Follow-up with Scott


== Today: ==
== Today: ==
* Complete CME meeting presentations postings
* Write SI2 supplement data management plan
* BBP Call 2pm
* Schedule HighF call
* Schedule HighF call
* Respond to Nadia and Illa
* Edit CME section of RFP
* Edit CME section of RFP
* Call with Christine on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
* Distribute exsim configuration file to christine
* Repost event file with updated Qp


== Blocked: ==
== Blocked: ==
Line 21: Line 17:


== Followups: ==  
== Followups: ==  
* No
*


== Pending: ==
== Pending: ==
*Call with Christine on site
*
*Call with Ralph on server diffs
*Feng email to Paul to help with validation part B
*Distribute exsim configuration file to christine
*Repost event file with updated Qp

Revision as of 17:10, 21 September 2012

Yesterday:

  • Posted CME files
  • Reviewed SI2 proposal and data management plan
  • BBP Call 2pm
  • Follow-up SAM meeting with Nadia and Illa
  • Confirm call with Ralph on server diffs for Monday 2pm

Today:

  • Schedule HighF call
  • Edit CME section of RFP
  • Call with Christine on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
  • Distribute exsim configuration file to christine
  • Repost event file with updated Qp

Blocked:

  • No

Followups:

Pending: