Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Scheduled High-F call for 4 Oct | ||
* | * Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration | ||
* Reposted event file with updated Qp | |||
* | |||
== Today: == | == Today: == | ||
* | * Meeting with JY on hypocenter posting, accts, and julL acct 11am | ||
* Telecon with JC on ucsb method at 2pm | |||
* Edit CME section of RFP | * Edit CME section of RFP | ||
* Distribute exsim configuration file to christine | * Distribute exsim configuration file to christine | ||
== Blocked: == | == Blocked: == | ||
Revision as of 16:17, 24 September 2012
Yesterday:
- Scheduled High-F call for 4 Oct
- Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
- Reposted event file with updated Qp
Today:
- Meeting with JY on hypocenter posting, accts, and julL acct 11am
- Telecon with JC on ucsb method at 2pm
- Edit CME section of RFP
- Distribute exsim configuration file to christine
Blocked:
- No