Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 3: Line 3:
* Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
* Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
* Reposted event file with updated Qp
* Reposted event file with updated Qp
* Responded to NCAR about Yellowstone early access


== Today: ==
== Today: ==

Revision as of 16:46, 24 September 2012

Yesterday:

  • Scheduled High-F call for 4 Oct
  • Had call with CG on (a) GMPE (b) editing wiki (c) 50 ruptures (d) seismogram duration
  • Reposted event file with updated Qp
  • Responded to NCAR about Yellowstone early access

Today:

  • Meeting with JY on hypocenter posting, accts, and julL acct 11am
  • Telecon with JC on ucsb method at 2pm
  • Edit CME section of RFP
  • Distribute exsim configuration file to christine
  • Sprint review and spring planning with FS
  • INCITE Quarterly report due Friday
  • PRAC Annual report due Friday

Blocked:

  • No

Followups:

  • No

Pending:

  • No