Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Monitor production runs - jobs running again on Kraken, down to 600K SUs
*Monitored production runs - poor performance, emailed ISI about changing lustre stripe size
*Worked on new PSA insertion code, a little more complex than first thought
*No improvement with 960 cores, back to 480, down to 2 simultaneous workflows
*Finished study wiki page
*Sent out disaggregation results and new plots for Kim
*Responded to Maren
*Responded to Yifeng
*CyberShake calls yesterday


== Today ==
== Today ==
*Add description of seismogram and PSA header design decisions
*Add description of seismogram and PSA header design decisions
*Disaggregation results and new plots for Kim
*Test PSA insertions
*Test PSA insertions
*Monitor runs with changed parameters


== Blocked ==
== Blocked ==
*Downtime on Kraken
*No


== Follow-ups ==
== Follow-ups ==

Revision as of 17:03, 12 October 2012

Yesterday

  • Monitored production runs - poor performance, emailed ISI about changing lustre stripe size
  • No improvement with 960 cores, back to 480, down to 2 simultaneous workflows
  • Sent out disaggregation results and new plots for Kim

Today

  • Add description of seismogram and PSA header design decisions
  • Test PSA insertions
  • Monitor runs with changed parameters

Blocked

  • No

Follow-ups

  • No


  • Run test of I/O forwarding on Kraken
  • Continue testing compiler optimizations
  • Run some I/O tests to get reference values


Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration