Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Monitored production runs
*Worked on ExtractSGT
*Continued work on ExtractSGT_MPI


== Today ==
== Today ==
*Work on ExtractMPI
*Finish up work on ExtractSGT
*Create presentation about parallel simulated annealing for HPC booth, get feedback from Kevin and Phil
*Get Tom information on SCEC workflows
*Plot lines of best fit on Kraken runs to use better runtime estimates in DAX generator to improve load balancing
*Construct database test with simultaneous reads on shock and surface


== Blocked ==
== Blocked ==

Revision as of 18:02, 26 November 2012

Yesterday

  • Worked on ExtractSGT

Today

  • Finish up work on ExtractSGT
  • Get Tom information on SCEC workflows
  • Construct database test with simultaneous reads on shock and surface

Blocked

  • No

Follow-ups

  • No


  • Run test of I/O forwarding on Kraken
  • Continue testing compiler optimizations
  • Run some I/O tests to get reference values


Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration