Blue Waters: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
*[http://www.ncsa.illinois.edu/BlueWaters/ Blue Waters Home Page]


The table below summarizes the key parameters of the various Phases of the
Blue Waters system.  Phase 2 is expected to go into production in Summer 2012,
and in Fall 2012, the Phase 3 system will have Kepler accelerators installed in the
XK nodes.  For more details, see the newly revised Blue Waters PRAC wiki page:


https://wiki.ncsa.illinois.edu/display/BWpublic/User+Information
https://wiki.ncsa.illinois.edu/display/BWpublic/User+Information

Revision as of 18:18, 3 December 2012