Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* CyberShake call (11am)
* Build CVM-H on Stampede
* Conference travel discussions with JM
* Attempt to build CVM-S on Stampede
* UCERF3 allocation meeting
* Feedback on TACC UCERF3 image
* NSF Meeting travel planning
* Check on use of yeti before re-purposing
* XSEDE allocation response reviews
* SEISM 1 pager and poster material to RT
* Check on etree status
* re-order ALCF cryptocard
* Broadband update with FS
* Review SSA BBP abstract


== Today: ==
== Today: ==
* Collect XSEDE allocation stats for response
* Setup Geoinformatics agenda
* BBP Call with JB (11am)
* Scheduling meeting with interns
* Campus Champion call (3pm)
* Touch-base 1pm
* SCEC proposal reviews
* Schedule Perf Reveiws
* Add seism project information to wiki
*


== Blocked: ==
== Blocked: ==
Line 26: Line 18:


== Pending: ==
== Pending: ==
* Trilinear meshing discussion with Po and team
* Trilinear meshing discussion with Po and team (6 Feb 2013)
 
* INCITE goals for 2013
* Workflow call with JT
* Software environment codes to FS
* BBP priorities with PS
* Proposal review

Revision as of 17:28, 29 January 2013

Yesterday:

  • Build CVM-H on Stampede
  • Attempt to build CVM-S on Stampede
  • Feedback on TACC UCERF3 image
  • Check on use of yeti before re-purposing

Today:

  • Setup Geoinformatics agenda
  • Scheduling meeting with interns
  • Touch-base 1pm
  • Schedule Perf Reveiws

Blocked:

  • No

Followups:

  • No

Pending:

  • Trilinear meshing discussion with Po and team (6 Feb 2013)