Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Blue Waters:
*Blue Waters:
**System down
**Tested post-AWP helper scripts, found bugs, retesting
**Worked on workflow generation script
**Validated RWG TEST V3.0.3 SGTs
*Stampede:
*Stampede:
**Worked with Gideon to identify PMC bug with kickstart
**Tested PP again with TEST, validated
*Kraken:
*Kraken:
**Validated results from Stampede SGT workflow
**Ran post-processing with RWG TEST V3.0.3 SGTs, validated
*UCERF 3 with 1 Hz production run estimates
*CyberShake calls - updated computational plan
*NICS call
*Worked with David on setting up remaining runs


== Today ==
== Today ==
*Blue Waters:
*Blue Waters:
**Test post-AWP helper scripts
**Commit AWP helper scripts to SVN
**Commit AWP helper scripts to SVN
**Validate AWP WNGC SGTs
**Continue testing post-AWP helper scripts
**Validate RWG TEST V3.0.3 SGTs
**Validate AWP WNGC SGTs on Kraken
*Stampede:
*Stampede:
**If Gideon fixes bug, test PP again
**Run s351 PP with timing numbers to get performance comparison with Kraken
**Install and test AWP helper scripts
**Install and test AWP helper scripts
**Test AWP SGT generation
**Test AWP SGT generation
*Kraken:
*Kraken:
**Validate AWP WNGC SGTs
**Select a rupture for forward simulation
**Select a rupture for forward simulation
**Run post-processing with AWP WNGC SGTs
**Run post-processing with RWG TEST V3.0.3 SGTs
*Add AWP helper scripts to AWP workflow
*Add AWP helper scripts to AWP workflow
*Produce site list + KML for CS Study 2.3


== Blocked ==
== Blocked ==
Line 29: Line 30:


== Follow-ups ==  
== Follow-ups ==  
*CyberShake calls
*No
*Possibly with David re: RLS
 
 
*Watch Morgan's AGU presentation
*Reply to TACC, NICS regarding authorized people


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:08, 21 February 2013

Yesterday

  • Blue Waters:
    • Tested post-AWP helper scripts, found bugs, retesting
    • Worked on workflow generation script
    • Validated RWG TEST V3.0.3 SGTs
  • Stampede:
    • Tested PP again with TEST, validated
  • Kraken:
    • Ran post-processing with RWG TEST V3.0.3 SGTs, validated
  • CyberShake calls - updated computational plan
  • Worked with David on setting up remaining runs

Today

  • Blue Waters:
    • Commit AWP helper scripts to SVN
    • Continue testing post-AWP helper scripts
    • Validate AWP WNGC SGTs on Kraken
  • Stampede:
    • Run s351 PP with timing numbers to get performance comparison with Kraken
    • Install and test AWP helper scripts
    • Test AWP SGT generation
  • Kraken:
    • Validate AWP WNGC SGTs
    • Select a rupture for forward simulation
  • Add AWP helper scripts to AWP workflow
  • Produce site list + KML for CS Study 2.3

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration