Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 12: Line 12:
* Monitor Tottori and Niigata runs on epicenter
* Monitor Tottori and Niigata runs on epicenter
** Possible issue with simulation duration
** Possible issue with simulation duration
** Need Improve arias duration processing
* Call with JC to discuss running GMPEs with UCSB code
* Call with JC to discuss running GMPEs with UCSB code
* Look into ways to improve arias duration calculation performance
* Look into ways to improve arias duration calculation performance

Revision as of 18:16, 21 February 2013

Yesterday:

  • Running Tottori and Niigata on epicenter
    • Niigata almost complete, Tottori queued up
  • Set up broadband for RS to use on epicenter
    • Ran to collect data for code improvements
  • Finished broadband workflow 'resume' feature
    • Simple way to resume (or restart a workflow) from a particular module

Today:

  • Monitor Tottori and Niigata runs on epicenter
    • Possible issue with simulation duration
  • Call with JC to discuss running GMPEs with UCSB code
  • Look into ways to improve arias duration calculation performance
  • Continue ExSim integration
    • Work on workflow generator

Blocked:

  • No

Followups:

  • Call with JC @ 11am