Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Finished Niigata and Tottori validation events using GP method | ||
** | ** Sent results to RG | ||
* | ** Recorded ground motions look to be unfiltered raw data | ||
** | ** Sent e-mail to CG, RG with sample waveforms | ||
* | * Call with JC to discuss running the UCSB method | ||
** | ** JC set up on broadband and running his code | ||
* Fixed bug in 1-component vs 3-component GOF plots | |||
* Replied to KA about how to modify parameters on ExSim | |||
== Today: == | == Today: == | ||
* | * Make BBToolbox get event magnitude from SRC file instead of calculating it from SRF | ||
* Look into ways to improve arias duration calculation performance | * Look into ways to improve arias duration calculation performance | ||
* Continue ExSim integration | * Continue ExSim integration | ||
** Work on workflow generator | ** Work on workflow generator | ||
* BBP science call | |||
== Blocked: == | == Blocked: == | ||
| Line 21: | Line 22: | ||
== Followups: == | == Followups: == | ||
* | * BBP science call @ 2pm | ||
Revision as of 17:59, 22 February 2013
Yesterday:
- Finished Niigata and Tottori validation events using GP method
- Sent results to RG
- Recorded ground motions look to be unfiltered raw data
- Sent e-mail to CG, RG with sample waveforms
- Call with JC to discuss running the UCSB method
- JC set up on broadband and running his code
- Fixed bug in 1-component vs 3-component GOF plots
- Replied to KA about how to modify parameters on ExSim
Today:
- Make BBToolbox get event magnitude from SRC file instead of calculating it from SRF
- Look into ways to improve arias duration calculation performance
- Continue ExSim integration
- Work on workflow generator
- BBP science call
Blocked:
- No
Followups:
- BBP science call @ 2pm