Staff Priorities - Masha: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Liukis (talk | contribs)
No edit summary
Liukis (talk | contribs)
No edit summary
Line 3: Line 3:
=== Yesterday ===
=== Yesterday ===


* CSEP status and priorities with Phil
* EEW: investigated 2 missing events for 2012/12/14 - outside of testing region


* Trac ticket #306 Don't preserve OneDayModelInputCatalog data products within testing framework
* Trac ticket #306 Don't preserve OneDayModelInputCatalog data products within testing framework


* NZTC:
* New CSEP server: file system mount problems, John is looking into various options
** Finished hybrid forecasts generation
 
* EEW new VM image: caught up with processing since 2012/12/13 - failures for two days


=== Today ===
=== Today ===
==== CSEP ====
==== CSEP ====


* EEW: investigate failures for two days
* CSEP status meeting at 9am:
** Post meeting minutes
** Send next meeting announcement


* CSEP new server: run complete set of unit and acceptance tests
* Working on acceptance tests for Trac ticket #306 Don't preserve OneDayModelInputCatalog data products within testing framework
 
* Trac ticket #306 Don't preserve OneDayModelInputCatalog data products within testing framework


* Request from Danijel for USGS vs RELM Mainshock evaluation results
* Request from Danijel for USGS vs RELM Mainshock evaluation results

Revision as of 18:35, 27 February 2013

Current Activities

Yesterday

  • EEW: investigated 2 missing events for 2012/12/14 - outside of testing region
  • Trac ticket #306 Don't preserve OneDayModelInputCatalog data products within testing framework
  • New CSEP server: file system mount problems, John is looking into various options

Today

CSEP

  • CSEP status meeting at 9am:
    • Post meeting minutes
    • Send next meeting announcement
  • Working on acceptance tests for Trac ticket #306 Don't preserve OneDayModelInputCatalog data products within testing framework
  • Request from Danijel for USGS vs RELM Mainshock evaluation results
  • Open Trac tickets:
    • 295 Diagnostics tests should be applied to time-dependent forecasts
    • 303 Process Global experiments for 2012/12: 8-17 due to network issues on csep-op server
    • 302 Develop interactive results viewer application:
      • Waiting for current processing to finish to enable VM

Blocked: None

Followups: None

Responsiblities