Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 16: Line 16:
**Set up with AWP
**Set up with AWP
*Kraken:
*Kraken:
**Investigate OOM failures with new workflows
**Error on PP with Blue Waters AWP WNGC SGTs; investigate
**Error on PP with Blue Waters AWP WNGC SGTs; investigate
*Update Pegasus to get new output-dir
*Update Pegasus to get new output-dir
Line 21: Line 22:
*Add AWP helper scripts to DAX generator
*Add AWP helper scripts to DAX generator
*Email cybershake list to notify about CS Study 2.3 site list
*Email cybershake list to notify about CS Study 2.3 site list
== Blocked ==
== Blocked ==
*No
*No

Revision as of 18:18, 25 February 2013

Yesterday

  • Blue Waters:
    • Ran post-AWP scripts
    • Finished defining workflow-generating scripts
  • Stampede:
    • Continued testing PP with different combinations of widths and number of DAXes
  • Kraken:
    • Submitted WNGC AWP SGTs from BW
    • Configure forward RWG simulation

Today

  • Blue Waters:
    • Test workflow-generating scripts
  • Stampede:
    • Continue testing PP configurations
    • Set up with AWP
  • Kraken:
    • Investigate OOM failures with new workflows
    • Error on PP with Blue Waters AWP WNGC SGTs; investigate
  • Update Pegasus to get new output-dir
  • Prepare and travel for Blue Waters workshop
  • Add AWP helper scripts to DAX generator
  • Email cybershake list to notify about CS Study 2.3 site list

Blocked

  • No

Follow-ups

  • Nico at 11
  • Jessica at 12

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration