Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 4: Line 4:
* Held SEISM call
* Held SEISM call
* Call with TACC
* Call with TACC
* Updated wiki with Geoinformatics Projec Call
* Prepare metrics report


== Today: ==
== Today: ==
* Respond to SHACC meeting
* Send out Geoinformatics reminder
* Respond to SHACC meeting invite
* Email to TACC for unpurged space
* Email to TACC for unpurged space
* Email to Blue Waters about Grid-job submission
* Email to Blue Waters about Grid-job submission
* Prepare metrics report for Call tomorrow
* Complete adding new users to all systems


== Blocked: ==
== Blocked: ==
Line 19: Line 22:
== Pending: ==
== Pending: ==
* Geoinformatics schedule of topics for calls
* Geoinformatics schedule of topics for calls
* Complete adding new users to all systems
* UCERF3.0 on Stampede plans
* UCERF3.0 on Stampede plans
* Ask when UCERF3 will be ready for CSEP
* Ask when UCERF3 will be ready for CSEP
* Discuss Arias Duration on bbp
* Discuss Arias Duration on bbp
* Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0
* Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0

Revision as of 18:26, 4 March 2013

Yesterday:

  • Sent EEW update
  • Wrote and submitted INCITE Q4 report
  • Held SEISM call
  • Call with TACC
  • Updated wiki with Geoinformatics Projec Call
  • Prepare metrics report

Today:

  • Send out Geoinformatics reminder
  • Respond to SHACC meeting invite
  • Email to TACC for unpurged space
  • Email to Blue Waters about Grid-job submission
  • Complete adding new users to all systems

Blocked:

  • No

Followups:

  • No

Pending:

  • Geoinformatics schedule of topics for calls
  • UCERF3.0 on Stampede plans
  • Ask when UCERF3 will be ready for CSEP
  • Discuss Arias Duration on bbp
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0