Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Contacted TACC regarding account | ||
* | * Revised acceptance test script | ||
** | ** Purged old tests from svn | ||
* | * Checked new workflow generator into svn | ||
* | * Generated new BBP package | ||
** Sent it to KA and PM | |||
* | |||
* | |||
== Today: == | == Today: == | ||
* | * Look into integrating the environment metadata code into broadband | ||
* | * Study the arias duration code | ||
* | * PyCon follow-ups | ||
== Blocked: == | == Blocked: == | ||
| Line 22: | Line 18: | ||
== Followups: == | == Followups: == | ||
* | * No | ||
Revision as of 17:20, 18 March 2013
Yesterday:
- Contacted TACC regarding account
- Revised acceptance test script
- Purged old tests from svn
- Checked new workflow generator into svn
- Generated new BBP package
- Sent it to KA and PM
Today:
- Look into integrating the environment metadata code into broadband
- Study the arias duration code
- PyCon follow-ups
Blocked:
- No
Followups:
- No