Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Created combined bias plot code
* Fixed issue so that link to xml file is part of the html index file
** Post-processes realizations and creates a combined bias plot
* Fixed gp_gof unit test so that it works now
** Showed results to CG, took suggestions
* Created BBP 13.5.0 distribution
** Code finished and checked into svn
** Created source distribution and GF/VAL packages
* CSM Method
** Moved code to epicenter, updated install
** Generated results for all 5 california events for part A
* Skype call with SC to get him set up with BBP on epicenter
** Created combined plots, ranking file
* Started Broadband 13.5 Study on epicenter
** Sent results to JA
* Got UCSB code from JC
** Got code update from JA with fix to green's function generator bug
* Reset Broadband.usc.edu server (down since last night)
** Update BBP version, patch fixes GF code's bug
* Irikura method
** Got filter details from JB
** Worked on converting 1-component Irikura file to BBP seismograms
* Talked to JC
** Provided instructions on how to run on cluster
** Got JC set up on epicenter, ready to go
* Worked with KO and RS to fix SDSU method
** Got fixes for 2 bugs in the SDSU code
** Code still produces different low-frequency seismograms
* ExSIM method
** Received e-mail from KA regarding ExSIM's parameters
** Follow-up with KA and CG to clarify per-event issues


== Today: ==
== Today: ==


* Finish Irikura code, run simulations on epicenter for part A and part B
* Monitor production runs
* Waiting for SDSU code update
** Move data to hypocenter as runs complete
* Ran last GMPE scenario for CSM method, send results to JA
* Look at JC's code
* Clean up hypocenter/epicenter old runs


== Blocked: ==
== Blocked: ==
Line 34: Line 22:


== Followups: ==
== Followups: ==
* SEISM call @ 11am
* Cybershake calls @ 11am
* EXSIM call with CG and KA @ 1pm

Revision as of 17:12, 15 May 2013

Yesterday:

  • Fixed issue so that link to xml file is part of the html index file
  • Fixed gp_gof unit test so that it works now
  • Created BBP 13.5.0 distribution
    • Created source distribution and GF/VAL packages
    • Moved code to epicenter, updated install
  • Skype call with SC to get him set up with BBP on epicenter
  • Started Broadband 13.5 Study on epicenter
  • Got UCSB code from JC
  • Reset Broadband.usc.edu server (down since last night)

Today:

  • Monitor production runs
    • Move data to hypocenter as runs complete
  • Look at JC's code
  • Clean up hypocenter/epicenter old runs

Blocked:

  • No

Followups:

  • Cybershake calls @ 11am