Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Blue Waters:
*Blue Waters:
**Monitor production runs
**Monitored production runs
**Worked on revised approach to just read points from rupture geometry file - progressed to testing
**Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug
**Pointed Efecan towards 1 Hz run
*Stampede:
**Continued work on offloading code
*Sent out map with locations of sites with all four permutations from Study 13.4
*Sent out curve diff


== Today ==
== Today ==
*Blue Waters:
*Blue Waters:
**Monitor production runs
**Continue monitoring production runs
**Continue testing and getting performance numbers for revised extraction jobs
**Point Efecan and Liwen towards coscheduling and post-processing
*Stampede:
*Stampede:
**Continue work on offloading code
**Continue work on offloading code
*ID rupture for Marine
*Identify largest-difference curves, send out plots


== Blocked ==
== Blocked ==
Line 16: Line 21:


== Follow-ups ==  
== Follow-ups ==  
*CyberShake calls
*Phil and David - 12-1
*Call with Bob and Nick





Revision as of 17:38, 10 May 2013

Yesterday

  • Blue Waters:
    • Monitored production runs
    • Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug
    • Pointed Efecan towards 1 Hz run
  • Stampede:
    • Continued work on offloading code
  • Sent out map with locations of sites with all four permutations from Study 13.4
  • Sent out curve diff

Today

  • Blue Waters:
    • Continue monitoring production runs
    • Point Efecan and Liwen towards coscheduling and post-processing
  • Stampede:
    • Continue work on offloading code
  • Identify largest-difference curves, send out plots

Blocked

  • No

Follow-ups

  • Phil and David - 12-1


Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration