Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Fixed issue so that link to xml file is part of the html index file
* Worked on BBP 13.6.0 distribution
* Fixed gp_gof unit test so that it works now
* Received Japan parameters from EXSIM, CSM, SDSU
* Created BBP 13.5.0 distribution
* Received Tottori new SRC file from PS
** Created source distribution and GF/VAL packages
* Integrated UCSB code into BBP platform
** Moved code to epicenter, updated install
** Call with JC about integration and other issues
* Skype call with SC to get him set up with BBP on epicenter
** GFs for NoCal, SoCal, Mojave
* Started Broadband 13.5 Study on epicenter
** Test runs on BBP and epicenter
* Got UCSB code from JC
* Ran Niigata test run for SDSU, sent results to KO, RT
* Reset Broadband.usc.edu server (down since last night)
* Contacted each modeling group wrt 13.6 re-runs


== Today: ==
== Today: ==


* Monitor production runs
* Compare 13.5 and 13.6 test runs
** Move data to hypocenter as runs complete
* Create run chart for 13.6
* Look at JC's code
* Priority is UCSB, Japan for everybody, and other re-run requests
* Clean up hypocenter/epicenter old runs
* Possible NPS re-run for everybody
* Prepare for 13.6 runs
** Clean up hypocenter/epicenter old runs


== Blocked: ==
== Blocked: ==
Line 22: Line 24:


== Followups: ==
== Followups: ==
* Cybershake calls @ 11am
* No

Revision as of 18:01, 29 May 2013

Yesterday:

  • Worked on BBP 13.6.0 distribution
  • Received Japan parameters from EXSIM, CSM, SDSU
  • Received Tottori new SRC file from PS
  • Integrated UCSB code into BBP platform
    • Call with JC about integration and other issues
    • GFs for NoCal, SoCal, Mojave
    • Test runs on BBP and epicenter
  • Ran Niigata test run for SDSU, sent results to KO, RT
  • Contacted each modeling group wrt 13.6 re-runs

Today:

  • Compare 13.5 and 13.6 test runs
  • Create run chart for 13.6
  • Priority is UCSB, Japan for everybody, and other re-run requests
  • Possible NPS re-run for everybody
  • Prepare for 13.6 runs
    • Clean up hypocenter/epicenter old runs

Blocked:

  • No

Followups:

  • No