Staff Priorities - Masha: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Liukis (talk | contribs)
No edit summary
Liukis (talk | contribs)
No edit summary
Line 3: Line 3:
=== Yesterday ===
=== Yesterday ===


* csep-op server:
* John reported that data copy from existing csep-cert to new csep-cert server is complete:
** Data request from Alvaro Gonzalez (alarm-based one-day models):
** Tried to restore daily processes, could not due to all files owned by 'root'
*** Posted reprocessed missing dates for 2010 for all testing regions within SCEC testing center
** Asked John to change file permissions
*** Posted 2011-2013 data for all testing regions within SCEC testing center


* John set up new csep-cert server:
* CSEP Trac tickets:
** Ran some acceptance tests and generated daily CA forecasts - 2-3 times faster than existing csep-cert
** #311: Add support for different evaluation tests schedules within the same forecast group
** Asked John to proceed with an upgrade
*** Committed all code changes and new acceptance tests to SVN
** Trac ticket #312: Add support for 30-minutes forecasts


* Danijel sent Global hires forecast template description for review
* TD:
** Responded to Danijel that we may need to change CSEP to handle ~3Gb large forecasts
** Ji provided updated model to support input parameter file generated by the testing center
** Asked Danijel to contact Phil and Tom if it's a high priority


* TD:
* New Zealand testing center is upgrading CSEP to V13.4.0, Matt sent email that running image got overwritten
** Compiled and ran test case for Ji's model
** Logged in to NZ server, everything looks good
** Model is submitted for 9 testing regions, sent email to Rowena asking how to proceed (there is only CA region in the testing center right now)
** Asked John to respond to Ray (NZ system administrator)
** Asked Ji to modify the code so testing center provides all runtime information to the model through "input" file


=== Today ===
=== Today ===
==== CSEP ====
==== CSEP ====


* TD: Proceed with installation if Rowena and Ji respond
* CSEP: sent out reminder for tomorrow's status meeting at 9:30am


* CSEP Trac tickets:
* TD: Installation of Ji's model
** Acceptance tests for #311: Add support for different evaluation tests schedules within the same forecast group


=== TODO ===
=== TODO ===


* CSEP:
* CSEP:
** Trac ticket #312: Add support for 30-minutes forecasts
** M8 installation
** M8 installation


'''Blocked''': None
'''Blocked''': None
'''Followups''': None
'''Followups''': None



Revision as of 17:34, 11 June 2013

Current Activities

Yesterday

  • John reported that data copy from existing csep-cert to new csep-cert server is complete:
    • Tried to restore daily processes, could not due to all files owned by 'root'
    • Asked John to change file permissions
  • CSEP Trac tickets:
    • #311: Add support for different evaluation tests schedules within the same forecast group
      • Committed all code changes and new acceptance tests to SVN
    • Trac ticket #312: Add support for 30-minutes forecasts
  • TD:
    • Ji provided updated model to support input parameter file generated by the testing center
  • New Zealand testing center is upgrading CSEP to V13.4.0, Matt sent email that running image got overwritten
    • Logged in to NZ server, everything looks good
    • Asked John to respond to Ray (NZ system administrator)

Today

CSEP

  • CSEP: sent out reminder for tomorrow's status meeting at 9:30am
  • TD: Installation of Ji's model

TODO

  • CSEP:
    • M8 installation

Blocked: None

Followups: None

Responsiblities