Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Swam with sea turtles, sea lions, penguins, hammerheads
*Caught up on email
*Saw 5 species of monkeys, caimans
*Started looking at failed CyberShake PP runs
*Ate grubs
*May have fixed wireless card issues


== Today ==
== Today ==
*Catch up on email
*Continue work on failed CyberShake runs - loosen up allowed values, especially at high periods
*Check on failed CyberShake PP runs
*Metrics from production runs
*Start on metrics from production runs
*Resume scec-02 -> scec-04 copy
*Deal with wireless card issues


== Blocked ==
== Blocked ==
Line 14: Line 13:


== Follow-ups ==  
== Follow-ups ==  
*Possibly with John - CyberShake storage
*No


Finish wiki entries for Stampede and Blue Waters validation
Finish wiki entries for Stampede and Blue Waters validation

Revision as of 17:18, 11 June 2013

Yesterday

  • Caught up on email
  • Started looking at failed CyberShake PP runs
  • May have fixed wireless card issues

Today

  • Continue work on failed CyberShake runs - loosen up allowed values, especially at high periods
  • Metrics from production runs
  • Resume scec-02 -> scec-04 copy

Blocked

  • No

Follow-ups

  • No

Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration
  • Blue Waters:
    • Get metrics from production SGTs
  • Stampede:
    • Submit failed PP runs
  • Check in on Broadband runs on epicenter
  • Continue scec-02 -> scec-04 data copy
  • Analyze curve sensitivity results