Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Worked on proxy issue - USC CA is using outdated format.
*Worked on modifying SGT workflow generator, some refactoring
*Pinged on quota issue, no response
*Kevin generated 200m spacing and populated, going to confirm today
*Populated single Study 13.4 wf into sqlite DB for Karan's XSEDE poster
*Emailed John Mehringer about USC auth
*Helped interns
*Helped interns
*Provided feedback on Pegasus XSEDE poster
*Tried to use myproxy but server is down, sent email


== Today ==
== Today ==
*Got OK from Rob for 200m spacing, Kevin is generating
*Continue work on refactoring and adding to SGT workflow generator
*Modify workflow generator to support AWP SGTs
*Start testing pre-processing with new rupture geometries
*Populate single Study 13.4 wf into sqlite DB so Karan can get metrics


== Blocked ==
== Blocked ==

Revision as of 17:02, 22 July 2013

Yesterday

  • Worked on modifying SGT workflow generator, some refactoring
  • Kevin generated 200m spacing and populated, going to confirm today
  • Populated single Study 13.4 wf into sqlite DB for Karan's XSEDE poster
  • Emailed John Mehringer about USC auth
  • Helped interns
  • Tried to use myproxy but server is down, sent email

Today

  • Continue work on refactoring and adding to SGT workflow generator
  • Start testing pre-processing with new rupture geometries

Blocked

  • Waiting to hear from USC auth on proxy progress

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration