Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Worked on modifying SGT workflow generator, some refactoring
*Finished refactoring SGT DAX generator and integrated workflow DAX generator
*Kevin generated 200m spacing and populated, going to confirm today
*Generated cert using myproxy
*Populated single Study 13.4 wf into sqlite DB for Karan's XSEDE poster
*BW closed ticket, but still can't write to file system
*Emailed John Mehringer about USC auth
*Helped interns
*Tried to use myproxy but server is down, sent email


== Today ==
== Today ==
*Continue work on refactoring and adding to SGT workflow generator
*Test pre-processing with new rupture geometries once complete
*Start testing pre-processing with new rupture geometries
*Ask John to disable RLS authorization
*Test new DAX generators


== Blocked ==
== Blocked ==
*Waiting to hear from USC auth on proxy progress
*Waiting to hear from USC auth or John Mehringer on workflow progress


== Follow-ups ==  
== Follow-ups ==  

Revision as of 17:48, 23 July 2013

Yesterday

  • Finished refactoring SGT DAX generator and integrated workflow DAX generator
  • Generated cert using myproxy
  • BW closed ticket, but still can't write to file system

Today

  • Test pre-processing with new rupture geometries once complete
  • Ask John to disable RLS authorization
  • Test new DAX generators

Blocked

  • Waiting to hear from USC auth or John Mehringer on workflow progress

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration