Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 2: Line 2:
*Tested workflows on Stampede - PP passes, still working on Integrated
*Tested workflows on Stampede - PP passes, still working on Integrated
*Discovered we need to populate RuptureVariations table in DB for ERF 36
*Discovered we need to populate RuptureVariations table in DB for ERF 36
*CyberShake calls
*CyberShake calls - move to AWP-SGT-GPU on Blue Waters
*Follow-up with Phil
*Follow-up with Phil
*Worked on UCVM improvements for 1 Hz
*Worked on UCVM improvements for 1 Hz
Line 9: Line 9:
*Respond to Marine
*Respond to Marine
*Continue testing integrated workflow
*Continue testing integrated workflow
*Work with 1 Hz rupture surfaces on HPC
*Insert RuptureVariation entries for ERF 36
*Run pegasus-statistics on Study 2.2 results
*Run pegasus-statistics on Study 2.2 results


== Blocked ==
== Blocked ==

Revision as of 17:28, 15 August 2013

Yesterday

  • Tested workflows on Stampede - PP passes, still working on Integrated
  • Discovered we need to populate RuptureVariations table in DB for ERF 36
  • CyberShake calls - move to AWP-SGT-GPU on Blue Waters
  • Follow-up with Phil
  • Worked on UCVM improvements for 1 Hz

Today

  • Respond to Marine
  • Continue testing integrated workflow
  • Insert RuptureVariation entries for ERF 36
  • Run pegasus-statistics on Study 2.2 results


Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration