Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Tested workflows on Stampede - PP passes, still working on Integrated
*Responded to Marine
*Discovered we need to populate RuptureVariations table in DB for ERF 36
*Continued inserting RuptureVariation entries for ERF 36
*CyberShake calls - move to AWP-SGT-GPU on Blue Waters
*Integrated workflow passes on Stampede
*Follow-up with Phil
*Emailed TACC for help with tera3d account
*Worked on UCVM improvements for 1 Hz
*Worked on UCVM improvements for 1 Hz


== Today ==
== Today ==
*Respond to Marine
*Check on Rupture Variation inserts for ERF 36
*Continue testing integrated workflow
*Insert RuptureVariation entries for ERF 36
*Run pegasus-statistics on Study 2.2 results
*Run pegasus-statistics on Study 2.2 results
 
*Test 1 Hz CyberShake velocity modifications
*Add job id update job to Integrated workflow
*Begin tests of integrated workflow on Blue Waters with scottcal proxy


== Blocked ==
== Blocked ==

Revision as of 17:09, 20 August 2013

Yesterday

  • Responded to Marine
  • Continued inserting RuptureVariation entries for ERF 36
  • Integrated workflow passes on Stampede
  • Emailed TACC for help with tera3d account
  • Worked on UCVM improvements for 1 Hz

Today

  • Check on Rupture Variation inserts for ERF 36
  • Run pegasus-statistics on Study 2.2 results
  • Test 1 Hz CyberShake velocity modifications
  • Add job id update job to Integrated workflow
  • Begin tests of integrated workflow on Blue Waters with scottcal proxy

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration