Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Started to create tar files for KW | ||
** | * BBP Science call | ||
* | * Responded to SGS | ||
** | ** Set up meeting at and after SCEC AM | ||
* | * e-mailed KA, JC, JA about calculating site response | ||
* | * Ran LP for UCSB | ||
** Eliminated OLEM station | |||
** Results way under-predicting | |||
== Today: == | == Today: == | ||
* | * Look at UCSB pipeline to confirm correct use of site response | ||
* | * Work on BBP 13.9.0 RC | ||
* Finish tar files for KW | |||
* Think about BBP poster for AM | |||
== Blocked: == | == Blocked: == | ||
| Line 17: | Line 21: | ||
== Followups: == | == Followups: == | ||
* | * No | ||
Revision as of 17:14, 26 August 2013
Yesterday:
- Started to create tar files for KW
- BBP Science call
- Responded to SGS
- Set up meeting at and after SCEC AM
- e-mailed KA, JC, JA about calculating site response
- Ran LP for UCSB
- Eliminated OLEM station
- Results way under-predicting
Today:
- Look at UCSB pipeline to confirm correct use of site response
- Work on BBP 13.9.0 RC
- Finish tar files for KW
- Think about BBP poster for AM
Blocked:
- No
Followups:
- No