Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
*Resumed | *Resumed 2s SA db insertion | ||
*Compared 1 Hz and 0.5 Hz SGTs, look good | |||
*Came up with ideas for reducing PP memory requirements | |||
* | *Calculated BW TEST curve with workflow tools, matches reference | ||
*Asked HPCC to add BW proxy to grid-mapfile | |||
* | |||
* | |||
* | |||
== Today == | == Today == | ||
* | *Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison | ||
*Test AWP-ODC-SGT GPU with modified output format | |||
*Work on poster | |||
*Monitor 2s SA db inserts | |||
*Retry UCVM | |||
*Try BBP when the RC is posted | |||
* | |||
* | |||
== Blocked == | == Blocked == | ||
| Line 26: | Line 18: | ||
== Follow-ups == | == Follow-ups == | ||
* | *CyberShake calls at 11 | ||
*Skype with John Yu at 1 | |||
== Areas of Responsibilities == | == Areas of Responsibilities == | ||
Revision as of 17:24, 4 September 2013
Yesterday
- Resumed 2s SA db insertion
- Compared 1 Hz and 0.5 Hz SGTs, look good
- Came up with ideas for reducing PP memory requirements
- Calculated BW TEST curve with workflow tools, matches reference
- Asked HPCC to add BW proxy to grid-mapfile
Today
- Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
- Test AWP-ODC-SGT GPU with modified output format
- Work on poster
- Monitor 2s SA db inserts
- Retry UCVM
- Try BBP when the RC is posted
Blocked
- No
Follow-ups
- CyberShake calls at 11
- Skype with John Yu at 1
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration