Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Resumed 2s SA db insertion
*Emailed blurb to Mats
*Compared 1 Hz and 0.5 Hz SGTs, look good
*Finished 2s SA db inserts, emailed Tom and Feng
*Came up with ideas for reducing PP memory requirements
*Emailed slides to Tom summarizing CyberShake progress in the past year
*Calculated BW TEST curve with workflow tools, matches reference
*Tried BBP, MOGof unit test took forever
*Asked HPCC to add BW proxy to grid-mapfile
*Queued up full-scale curve on BW
*CyberShake calls
*Meeting with John Yu


== Today ==
== Today ==
*Summary for Mats
*Work on poster
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
*Try BBP RC2
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison, check into large memory nodes
*Test AWP-ODC-SGT GPU with modified output format
*Test AWP-ODC-SGT GPU with modified output format
*Work on poster
*Check on full-scale BW
*Monitor 2s SA db inserts
*Retry UCVM
*Try BBP when the RC is posted
*Run full-scale curve on BW
*Generate PPT for Tom summarizing CyberShake progress in the past year


== Blocked ==
== Blocked ==
Line 21: Line 19:


== Follow-ups ==  
== Follow-ups ==  
*CyberShake calls at 11
*No
*Skype with John Yu at 1


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 19:49, 5 September 2013

Yesterday

  • Emailed blurb to Mats
  • Finished 2s SA db inserts, emailed Tom and Feng
  • Emailed slides to Tom summarizing CyberShake progress in the past year
  • Tried BBP, MOGof unit test took forever
  • Queued up full-scale curve on BW
  • CyberShake calls
  • Meeting with John Yu

Today

  • Work on poster
  • Try BBP RC2
  • Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison, check into large memory nodes
  • Test AWP-ODC-SGT GPU with modified output format
  • Check on full-scale BW

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration