Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Edit review and return DWR letter
* TJ discussion about BBP
* Send in INCITE 2013 Q3
* Ricardo CVM reviews
* Attendance stuff
* BBP Call with Christine
* HPCC talks scheduled
* Admin touch base 1pm
* Find BBP data posted - Earlier SRCs
* Review and return NCEE BBP paper to JB
* ShakeAlert testing center highlight for SCEC4 report
* Updated SC13 YC talk with cyberspace details


== Today: ==
== Today: ==
* Blue Waters Call
* Coordinate INCITE start-up call
* Coordinate INCITE start-up call
* Admin touch base 1pm
* SCEC proposals with MK
* SCEC proposal discussions


== Blocked: ==
== Blocked: ==
Line 18: Line 14:


== Followups: ==  
== Followups: ==  
* FS 10:30am
* TH 11am
* SC 11am


== Pending: ==
== Pending: ==

Revision as of 18:57, 14 November 2013

Yesterday:

  • TJ discussion about BBP
  • Ricardo CVM reviews
  • BBP Call with Christine
  • Admin touch base 1pm

Today:

  • Blue Waters Call
  • Coordinate INCITE start-up call
  • SCEC proposals with MK

Blocked:

  • No

Followups:

  • TH 11am

Pending:

  • Travel plans to AGU
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file