Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 3: | Line 3: | ||
== Today: == | == Today: == | ||
* DOE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
* SCEC EarthCube participation | * SCEC EarthCube participation | ||
* Chair Palace | * Visit Chair Palace | ||
* SSA Abstracts | * SSA Abstracts Due Jan 10 | ||
* UCVM email list (set group posting) | |||
* BBP Storage review | |||
* Update Calendars | |||
* Tom on NR products | |||
== Blocked: == | == Blocked: == | ||
Revision as of 17:59, 6 January 2014
Yesterday:
- Goodwill towards others
Today:
- DOE INCITE 2013 Final Report
- SCEC EarthCube participation
- Visit Chair Palace
- SSA Abstracts Due Jan 10
- UCVM email list (set group posting)
- BBP Storage review
- Update Calendars
- Tom on NR products
Blocked:
- No
Followups:
- Director Candidate Practice
- UCVM meeting ()
- BBP Meeting ()
- CSEP Meeting ()
- CyberShake Meeting ()
- UCERF Meeting ()
- High-F Update
Pending:
- THJ and YC Call
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file