Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 18: Line 18:
== Followups: ==
== Followups: ==
* DG conversion from 1D file to UCVM 1D config
* DG conversion from 1D file to UCVM 1D config
* CS parallelism discussion with SC


== Pending: ==
== Pending: ==
* Confirm SI2 meeting
* Confirm SI2 meeting
* CS parallelism discussion with SC
* FW ABF into CME codebase
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Formalize the simulation plans for NR

Revision as of 17:59, 30 January 2014

Yesterday:

  • Contact SRL editor
  • Contact ED about EC project
  • Work with DG on 1D model for CyberShake
  • Check with KO RG on Moho
  • Check on BBP Storage Status
  • Talk with EL

Today:

  • PC feedback
  • DOE INCITE 2013 Final Report
  • Send out Geo/SI2 Call Announce
  • TTI one paper

Blocked:

  • No

Followups:

  • DG conversion from 1D file to UCVM 1D config

Pending:

  • Confirm SI2 meeting
  • CS parallelism discussion with SC
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file