Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* DOE INCITE 2013 Final Report w/ GE
* PC feedback
* DOE INCITE 2013 Final Report w/ PC
* Send out Geo Call Announce
* INCITE ESP Project clean-up w/ PC, EL, GE, YC
* EC Discussion with TJ/ED
* BBP 1D model follow-up with DG
* Nvidia meeting at 1:30pm
* Coordinate EC Call with ED
* GTL archives for JS
* Review SRR from SC
* BW storage request w/ SC
** Requests: add CVM-H GTL Maps w/ test stations
** Requests: add 1D  plots w/ 1km transition to Moho
* EC Call with ED


== Today: ==
== Today: ==
* PC feedback
* Schedule CS Science Review
* Send out Geo/SI2 Call Announce
* EC Draft Update
* Review TRR
* Review TRR from SC
* Update EC prospectus
* TTI one pager
* TTI one pager
* INCITE 2013 Final Report Draft
* Send out Geo Call Announce


== Blocked: ==
== Blocked: ==
Line 24: Line 16:


== Followups: ==
== Followups: ==
* Nvidia meeting at 1:30pm
* BBP Med-term discussion
* Blue Waters Scheduled downtime


== Pending: ==
== Pending: ==

Revision as of 18:10, 3 February 2014

Yesterday:

  • PC feedback
  • Send out Geo Call Announce
  • EC Discussion with TJ/ED
  • Nvidia meeting at 1:30pm

Today:

  • Schedule CS Science Review
  • EC Draft Update
  • TTI one pager
  • INCITE 2013 Final Report Draft
  • Send out Geo Call Announce

Blocked:

  • No

Followups:

  • BBP Med-term discussion
  • Blue Waters Scheduled downtime

Pending:

  • Confirm SI2 meeting
  • CS parallelism discussion with SC
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file