Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
|||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Scheduled CS Science Review | ||
* | * EC Draft Update | ||
* | * INCITE 2013 Final Report Draft | ||
* | * Schedule High-F Call | ||
* | * Staff meeting | ||
== Today: == | == Today: == | ||
* | * INCITE Final Report Draft out | ||
* | * Web meeting (10:30am) | ||
* | * High-F Call (11am) | ||
* CyberShake Science Call (11:30am) | |||
* Send out | * Blue Waters Metrics one-pager | ||
* | * Send out SEISM Call Announcement | ||
* PC Final Reviews | |||
== Blocked: == | == Blocked: == | ||
| Line 19: | Line 20: | ||
== Followups: == | == Followups: == | ||
* BBP Med-term discussion | * BBP Med-term discussion | ||
* | * UCVM Meeting Wed (9am) | ||
== Pending: == | == Pending: == | ||
Revision as of 17:59, 4 February 2014
Yesterday:
- Scheduled CS Science Review
- EC Draft Update
- INCITE 2013 Final Report Draft
- Schedule High-F Call
- Staff meeting
Today:
- INCITE Final Report Draft out
- Web meeting (10:30am)
- High-F Call (11am)
- CyberShake Science Call (11:30am)
- Blue Waters Metrics one-pager
- Send out SEISM Call Announcement
- PC Final Reviews
Blocked:
- No
Followups:
- BBP Med-term discussion
- UCVM Meeting Wed (9am)
Pending:
- Confirm SI2 meeting
- CS parallelism discussion with SC
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file