Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Worked on KinModel code, removed all leaks, concerned about behavior under valgrind
*Finished work on KinModel code
*Blue Waters user call
*Posted some results from metrics scripts on Study 14.2
*Summer School call
*High F call
*CyberShake calls


== Today ==
== Today ==
*Continue work on KinModel code
*Fix issues with metrics scripts, post on wiki
*Run and post results from metrics scripts on Study 14.2
*If Rob responds, move ahead with rupture generator
*Outline list of tasks for 1 Hz


== Blocked ==
== Blocked ==
Line 11: Line 15:


== Follow-ups ==
== Follow-ups ==
*Summer School call
*High F call
*CyberShake calls
*Meeting with Phil later in week to discuss submission plan
*Meeting with Phil later in week to discuss submission plan



Revision as of 17:04, 19 March 2014

Yesterday

  • Finished work on KinModel code
  • Posted some results from metrics scripts on Study 14.2
  • Summer School call
  • High F call
  • CyberShake calls

Today

  • Fix issues with metrics scripts, post on wiki
  • If Rob responds, move ahead with rupture generator
  • Outline list of tasks for 1 Hz

Blocked

  • No

Follow-ups

  • Meeting with Phil later in week to discuss submission plan

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration