Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Gathered more metrics; trying to understand the difference between average nodes and application parallel speedup
*Calculated and plotted hypocenters for large San Andreas rupture, emailed out
*Tested Rob's modifications to rupture generator - reproducing reference results
*Got text together for Tom
*Calculated space needed for purge exemption - only about 100 GB, but may ask for 500 GB for testing space
*Reviewed Summer School applications
*CyberShake calls


== Today ==
== Today ==
*Finish gathering Study 14.2 metrics
*Email Matt to ask about unpurged request
*Test Rob's modifications in API
*Look over SeedMe to respond to Amit
*Respond to Amit about SeedMe
*Reply to Omar about metrics
*Start drafting abstract for extreme scaling
*Start drafting abstract for extreme scaling
*File Titan purge exemption
*Modify DAX generator to aggregate files at the source level and test
*Start preliminary work on merging extraction and synthesis stages


== Blocked ==
== Blocked ==
Line 17: Line 15:


== Follow-ups ==
== Follow-ups ==
*No
*Summer School call
*High-F
*CyberShake calls


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:08, 1 April 2014

Yesterday

  • Calculated and plotted hypocenters for large San Andreas rupture, emailed out
  • Got text together for Tom
  • Reviewed Summer School applications

Today

  • Email Matt to ask about unpurged request
  • Look over SeedMe to respond to Amit
  • Start drafting abstract for extreme scaling
  • Modify DAX generator to aggregate files at the source level and test
  • Start preliminary work on merging extraction and synthesis stages

Blocked

  • No

Follow-ups

  • Summer School call
  • High-F
  • CyberShake calls

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration