Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
* | *Produced TEST hazard curve with new RV generator, emailed to group | ||
* | *Produced SBSM, WNGC, PAS hazard curves with new RV generator | ||
*Emailed Phil XSEDE SU estimate for CyberShake work | |||
* | *Reviewed storage spreadsheet | ||
* | |||
== Today == | == Today == | ||
* | *Produce USC hazard curve | ||
* | *Calculate comparison curves, send out to group | ||
* | *Work on 200m rupture point spacing with new RVs | ||
**Calculate and insert into DB | |||
**Locate 200m SGTs | |||
**Queue curve | |||
== Blocked == | == Blocked == | ||
| Line 17: | Line 17: | ||
== Follow-ups == | == Follow-ups == | ||
* | *SEISM call | ||
Revision as of 17:09, 10 April 2014
Yesterday
- Produced TEST hazard curve with new RV generator, emailed to group
- Produced SBSM, WNGC, PAS hazard curves with new RV generator
- Emailed Phil XSEDE SU estimate for CyberShake work
- Reviewed storage spreadsheet
Today
- Produce USC hazard curve
- Calculate comparison curves, send out to group
- Work on 200m rupture point spacing with new RVs
- Calculate and insert into DB
- Locate 200m SGTs
- Queue curve
Blocked
- No
Follow-ups
- SEISM call
- Try out SeedMe so I can respond to Amit
- Start drafting abstract for extreme scaling
- Revise DAX generator to group output by source
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration