Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Worked on TEST hazard curve with new RV generator as requested by Rob
*Produced TEST hazard curve with new RV generator, emailed to group
**Modified TC
*Produced SBSM, WNGC, PAS hazard curves with new RV generator
**Modified DAX generator to support new RupGen version
*Emailed Phil XSEDE SU estimate for CyberShake work
**Upgraded Pegasus
*Reviewed storage spreadsheet
**Queued curve; failed on insert
*HighF call
*CyberShake call


== Today ==
== Today ==
*Continue work on TEST hazard curve
*Produce USC hazard curve
*Provide XSEDE SU estimate for CyberShake work
*Calculate comparison curves, send out to group
*Review storage spreadsheet
*Work on 200m rupture point spacing with new RVs
**Calculate and insert into DB
**Locate 200m SGTs
**Queue curve


== Blocked ==
== Blocked ==
Line 17: Line 17:


== Follow-ups ==
== Follow-ups ==
*No
*SEISM call





Revision as of 17:09, 10 April 2014

Yesterday

  • Produced TEST hazard curve with new RV generator, emailed to group
  • Produced SBSM, WNGC, PAS hazard curves with new RV generator
  • Emailed Phil XSEDE SU estimate for CyberShake work
  • Reviewed storage spreadsheet

Today

  • Produce USC hazard curve
  • Calculate comparison curves, send out to group
  • Work on 200m rupture point spacing with new RVs
    • Calculate and insert into DB
    • Locate 200m SGTs
    • Queue curve

Blocked

  • No

Follow-ups

  • SEISM call


  • Try out SeedMe so I can respond to Amit
  • Start drafting abstract for extreme scaling
  • Revise DAX generator to group output by source


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration