Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
* Spoke with SG regarding plots
 
* HF, CS calls
* Finished moving SWUS data to bbpvault
* Started SWUS April 2014 Study
* E-mailed KW, CA regarding availability of SWUS data
** https://scec.usc.edu/it/SWUS_GMC_SSHAC_-_April_2014_Simulations#Simulations_Using_Mode_1
* Received new scenarios from SG to plot
** Completed all reverse, and most strike-slip scenarios
** Part-A and Part-B events now
** Started remaining scenarios
* Pass on BBP documentation for 14.3
* Ran single Tottori realization for KO, RT
* Updated BBP scripts to generate super tables
** Sent results
* Key to 153B server room added to astronaut
* Talked to JY regarding BBP backup drives
** Should be back online today/tomorrow


== Today ==
== Today ==
* Create plots for SG: NR, Tottori, 2 GMPEs
* Allocation call
* Create tar files for SWUS scenario runs
* Broadband planning meeting
** Send link to KW, CA
* Create plots for SG: NR, Tottori, 4 GMPEs
* Finalize BBP 14.3 distribution
* Finalize BBP 14.3 packaging
* Post BBP 14.3 distribution


== Blocked: ==
== Blocked: ==
Line 21: Line 20:


== Followups: ==
== Followups: ==
* No
* High-F call at 11am
* BBP planning meeting at 1:30pm

Revision as of 17:01, 15 April 2014

Yesterday

  • Finished moving SWUS data to bbpvault
  • E-mailed KW, CA regarding availability of SWUS data
  • Received new scenarios from SG to plot
    • Part-A and Part-B events now
  • Pass on BBP documentation for 14.3
  • Updated BBP scripts to generate super tables
  • Key to 153B server room added to astronaut

Today

  • Allocation call
  • Broadband planning meeting
  • Create plots for SG: NR, Tottori, 4 GMPEs
  • Finalize BBP 14.3 packaging
  • Post BBP 14.3 distribution

Blocked:

  • No

Followups:

  • High-F call at 11am
  • BBP planning meeting at 1:30pm