Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* XSEDE | * XSEDE Advisory Board Meeting | ||
== Today: == | == Today: == | ||
* | * HPCC Meeting (12pm) | ||
* | * BBP Code Review (1pm) | ||
* Prepare extended BW Abstract | * Prepare extended BW Abstract | ||
* Setup TJ/JT coordination call | * Setup TJ/JT coordination call | ||
* Develop BBP paper outline | * Develop BBP paper outline | ||
| Line 19: | Line 17: | ||
== Pending: == | == Pending: == | ||
* Post laptop storage table on wiki | * Post laptop storage table on wiki | ||
* Test seism email list | * Test seism email list | ||
* Fix issues with Geo email list | * Fix issues with Geo email list | ||
Revision as of 16:55, 23 April 2014
Yesterday:
- XSEDE Advisory Board Meeting
Today:
- HPCC Meeting (12pm)
- BBP Code Review (1pm)
- Prepare extended BW Abstract
- Setup TJ/JT coordination call
- Develop BBP paper outline
Blocked:
- No
Followups:
- No
Pending:
- Post laptop storage table on wiki
- Test seism email list
- Fix issues with Geo email list
- GMPE New relations integrated into BBP
- FW ABF into CME codebase
- Setup license meeting with Stevens USC
- Updated BBP and UCVM required docs to include "known problems" file